From Blueprints to Breakthroughs
How Cogito Scaled 16.5K+ Reality Capture Walkthroughs with 95% Accuracy
Challenge
A leading reality capture company was looking for a partner who can meet their need to align 360 video walkthroughs paths correctly with digital paths generated on building drawings. They need a partner who can provide support round the clock and been flexible to change allocation of workforce in synch with seasonal & market changes.
Solution
Cogito Tech proposed a well-qualified Team of Civil & Architect professionals with an ability to interpret construction sites floor plans. These professionals are available round the clock for support with a flexibility to mould allocation in synch with seasonal & market changes.
Outcome
Cogito Tech achieved highest level of production within TAT timelines & with A Grade (100%) quality in 95% of processed volume. Cogito Tech also demonstrated Resource allocation flexibility during seasonal & market changes. It led to complete Client satisfaction due to which Cogito Tech turned into primary vendor and have started managing 70% of total available volume.

How did we start?
Our journey began with searching Civil & Architect Graduates who are skilled in comprehending Construction Floor Plans. These Civil & Architect Graduates of PILOT Team went through rigorous training and ramp up and thereafter started Production with 1st complexity level of Walkthroughs. Gradually, their capability to handle 2nd and 3rd complexity level of Walkthroughs developed and they accelerated the Production along with maintaining A Grade (100%) Accuracy in 95% processed volume.
Factors of Success
- Domain Expertise: Graduate in Civil Engineering and Architecture provided in-depth subject matter knowledge.
- Highly Skilled Workforce: Strong Construction Floor Plan comprehension and analytical abilities to attain high accuracy and processing speed.
- Round The Clock Workforce Model: Distribution of workforce in multiple shifts in 24 Hrs. of Cycle. Ensuring inflow of Walkthroughs must be cleared within specified TAT timelines.
The result?
Strong and stable Team of 75+ FTEs spreading across multiple shifts in 24 Hrs. of Cycle.
Capability to deliver 16.5k Video Walks of all 3-complexity levels with >95% A Grade (100%) Accuracy every month.